DMTF officially handed over to FCoE

Wednesday 19 February, 2020

Today (Feb 19th) in a festive gathering at the ‘Duurzaamheidsfabriek’ in Dordrecht, the Dynamic Maritime Test Facility (DMTF) was officially handed over to FCoE.

By handing over a bow, that ‘sealed the entry to DMTF, by Bas Ort (chairman of NMT) and Bas Buchner (president of Marin) to Roel de Graaf (coe NMT, this time as chairman of FCoE), the DMTF was symbolically handed over to FCoE enriching the center with a new innovative installation.


Bezoek adres:
Leerparkpromenade 50
3312KW Dordrecht-NL
FCoE is gevestigd in de
‘Duurzaamheidsfabriek’
op het Leerpark in Dordrecht.
Neem contact op via:
Postbus 931
3300 AX Dordrecht –NL
E-mail:info@flowcenter.nl

Flow Center of Excellence
Copyright 2024